Turnkey CBG / Bio-CNG Plant EPC · Kota, Rajasthan · Pan-India
CBG Plant · 10 TPD

10 TPD CBG Plant: Napier + Cow Dung Design, Cost & EPC

A 10 TPD (10,000 kg/day) Compressed Biogas plant is a commercial-scale asset with better economies of scale, but it needs a much larger and more reliable feedstock supply chain. The most common Indian design pairs Napier grass with a small share of cattle dung.

Updated 1 October 2026 · By the Biovardhan CBG engineering team

10 TPD CBG plant at a glance

  • Output: 10,000 kg CBG/day · about 3,300 t/year
  • Typical feed: 200–280 TPD fresh Napier grass + a little cattle dung · 350–550 acres of Napier
  • Indicative budget: ₹50–80 crore (excl. GST and land) · GOBARdhan assistance up to ₹20 crore
  • Who it suits: developers with assured land or contract farming, sugar groups, corporate and institutional investors, sites near a CGD pipeline

Why Napier grass + cow dung?

Napier grass supplies almost all of the gas. A 10 TPD plant draws about 99% of its CBG from the grass. The small dung share supplies active microbes and buffering that keep the digesters stable on a fibre-rich diet. The design priorities are:

  • Napier harvest (60–75 days)
  • Shredding
  • Twin-screw shearing
  • Mixing with dung & recirculated digestate
  • Hydrolysis tank
  • 2–3 CSTR digesters
  • Upgrading
  • 10 TPD CBG

Feedstock required for a 10 TPD CBG plant

Feedstock optionDaily feedstockAnnual feedstock (330 days)Notes
Napier grass (fresh) + a little cattle dung200–280 TPD66,000–92,400 tNeeds about 350–550 acres of irrigated Napier
Cattle dung only400–600 TPD132,000–198,000 tStable digestion; large collection logistics
Press mud200–300 TPD66,000–99,000 tSeasonal; store for the off-season or co-digest
Paddy straw (air-dry bales)80–110 TPD26,400–36,300 tHarvested in a few weeks; needs a large bale yard

Indicative planning ranges. Confirm with lab tests of your feedstock. Try the feedstock-to-CBG calculator.

Key design numbers

Parameter10 TPD CBG plant
CBG output10,000 kg/day · about 3,300 tonnes/year
Raw biogas (55–60% methane)≈ 24,000–26,000 Nm³/day
Digester working volume (Napier / agri-residue, ≈ 36–40 days retention)≈ 20,000 m³, usually split into 2–3 digesters
CBG qualityUpgraded to the BIS IS 16087:2025 specification, compressed to ≈ 250 bar
Electricity≈ 14,000–18,000 kWh/day (≈ 1.4–1.8 kWh per kg CBG)
Solid FOM≈ 24–40 TPD
Liquid fraction (LFOM)≈ 160–200 m³/day (part recirculated as process water)
Cascade truck loads (≈ 700–800 kg each)≈ 13–15 per day

Indicative economics

ItemIndicative figure
Project budget (full scope, excl. GST, land, working capital)≈ ₹50–80 crore (≈ ₹5–8 crore per TPD)
GOBARdhan capital assistance (eligible greenfield)Up to ₹20 crore (₹2 crore per TPD, subject to caps)
CBG sales at ₹46/kg*≈ ₹15.2 crore per year (3,300 t)
FOM Market Development Assistance (₹1,500/t on eligible FOM)≈ ₹1.2–2.0 crore per year, plus FOM sale value
Biggest operating costsNapier cultivation & harvesting, electricity (≈ 14,000–18,000 kWh/day), manpower, maintenance

*₹46/kg plus taxes is the SATAT minimum procurement price notified by oil marketing companies for 2024–2029. GOBARdhan (2026) introduces its own pricing framework, so check the current notification. All figures are planning estimates for your DPR.

What makes or breaks a 10 TPD project

  • Feedstock security: 350–550 acres of Napier under your control or long-term contract, with a monsoon buffer of about two weeks
  • Digester redundancy: two or three digesters, not one, so maintenance doesn't stop production
  • Power: an HT connection sized early. It is often on the critical path.
  • Gas evacuation: about 13–14 cascade loads a day, or a pipeline tie-in to a nearby CGD network
  • Digestate plan: 160–200 m³/day of liquid fraction needs a lagoon and farmland. LFOM can fertilise the Napier fields.

Starting smaller? See the 5 TPD CBG plant, or check an offer you have with our quotation checklist.

Frequently asked questions

An indicative full-scope budget for a 10 TPD Napier or agri-residue CBG plant is about ₹50–80 crore, excluding GST, land and working capital. Eligible greenfield projects can receive GOBARdhan capital assistance of up to ₹2 crore per TPD (up to ₹20 crore for 10 TPD), subject to scheme guidelines and caps.

Typically about 200–280 tonnes of fresh Napier grass per day plus a small quantity of cattle dung (for example around 5 TPD) as inoculum and buffer. That needs roughly 350–550 acres of irrigated Napier.

About 24,000–26,000 Nm³ of raw biogas per day at 55–60% methane, which is upgraded and compressed into 10,000 kg of CBG.

Total digester working volume is typically around 20,000 m³ for Napier at 36–40 days retention, usually split into two or three digesters so one can be maintained without stopping the plant.

Roughly 14,000–18,000 kWh per day, about 1.4–1.8 kWh per kg of CBG. An HT power connection is normally required, plus backup for critical loads.

At the SATAT minimum procurement price of ₹46/kg (plus taxes), 3,300 tonnes of CBG a year is about ₹15 crore in gas sales, plus FOM/LFOM income and eligible Market Development Assistance on FOM. Actual pricing under GOBARdhan should be checked against the current notification.

Build a CBG plant that performs, not just one that gets commissioned.

Talk to Biovardhan about feedstock, capacity (3 TPD to 20+ TPD), DPR, GOBARdhan registration and turnkey EPC.