Turnkey CBG / Bio-CNG Plant EPC · Kota, Rajasthan · Pan-India
CBG EPC Services

Turnkey CBG Plant EPC Company in India

One accountable engineering partner for your Compressed Biogas plant, from feedstock and DPR to digestion, upgrading, compression, commissioning and long-term O&M. Capacities from 3 TPD to 20+ TPD.

Updated 1 October 2026 · By the Biovardhan CBG engineering team

At a glance

  • Capacities: 3, 6, 9, 12, 15, 18, 20+ TPD CBG
  • Feedstocks: paddy straw, Napier grass, cattle dung, press mud, food & municipal organic waste, mixed feed
  • Technology: CSTR anaerobic digestion, membrane gas holders, biogas upgrading, CBG compression, PLC/SCADA
  • Beyond gas: FOM, LFOM, biochar, pellets and briquettes from digestate

Our EPC model: Pre-CBG + CBG + Post-CBG

India's CBG sector is entering a new growth phase under the GOBARdhan National Unified Scheme. Building a successful compressed biogas plant takes much more than installing a digester, a purifier and a compressor. The real challenge is integrating the complete value chain, so that is how Biovardhan builds its EPC model.

  • Biomass
  • Pretreatment
  • Digestion
  • Biogas
  • Purification
  • Compression
  • CBG
  • Digestate
  • FOM
  • LFOM
  • Biochar
  • Pellets / Briquettes

Many EPC discussions focus mainly on the digester, purification and compression sections. A CBG project starts before the digester and continues after the gas is produced. With one EPC umbrella, the plant owner has one partner responsible for the whole chain instead of several vendors blaming each other.

Complete turnkey CBG plant EPC scope

StageWhat Biovardhan delivers
Project developmentCompany/SPV setup support, land conversion & CLU coordination, DPR, GOBARdhan registration, buyer/offtake & LOI coordination, PESO-related licensing support as applicable
FeedstockFeedstock assessment & procurement strategy, storage, bale handling, shredding, crushing, twin-screw shearing, slurry preparation and controlled feeding
DigestionDigester design & process engineering, CSTR digesters, in-house agitators, heating and hydraulic design, raw biogas handling and membrane gas storage
UpgradingH₂S & moisture removal, CO₂ separation / biogas upgradation (sourcing and integration of reputed scrubbers and purifiers), CH₄/CO₂/H₂S quality monitoring
CompressionCBG compression and cascade integration for dispensing, cylinder filling or pipeline injection, as applicable
Balance of plantCivil, mechanical & electrical works, instrumentation, PLC & SCADA automation, fire, gas & process safety systems, utilities
Post-CBGDigestate dewatering, FOM and LFOM plants, biochar and pelletisation routes
OperationsInstallation & commissioning, biological stabilisation, performance testing, one-year ramp-up support, operator training, post-installation O&M

Why some CBG EPC projects underperform

A CBG plant that consistently produces its designed gas quantity and quality is an engineering achievement. Common reasons plants fall short:

  • Inadequate feedstock characterisation and copy-paste plant design
  • Wrong or insufficient pretreatment of fibrous biomass, leading to floating layers and poor digestion
  • Poor slurry preparation, feeding, mixing and hydraulic design
  • Inadequate temperature and process control
  • Weak integration between digestion, purification and compression
  • Weak commissioning, little operator training and no dependable after-sales support
  • Project economics built on unrealistic gas-yield assumptions

Our philosophy addresses each one: feedstock first, engineering second, equipment third. Every project is engineered around its actual feedstock, operating conditions, required gas output and economics, not around a standard equipment package.

In-house manufacturing & technology partnerships

We aim to be more than an EPC coordination company. With about 125,000 sq. ft. of covered manufacturing infrastructure, our approach combines engineering with manufacturing:

  • Agitators and mixing systems
  • Bio shearing machines for biomass pretreatment
  • Feedstock handling equipment
  • Digester integration components
  • SCADA & plant automation
  • FOM / LFOM processing machinery

Biovardhan is an Authorized Channel Partner of AMOCO Membrane Gas Holders for India, bringing proven membrane gas-storage technology into CBG projects. Scrubbers, purifiers and compressors are sourced from reputed manufacturers and integrated by our engineering team.

How we execute a CBG project

  1. Feedstock studyQuantity, seasonality, lab analysis and delivered cost
  2. Concept & sizingTPD, technology route and site layout
  3. DPR & financialsBank-ready project report
  4. ApprovalsGOBARdhan, offtake, PCB, PESO, fire
  5. Detailed engineeringProcess, civil, mechanical, electrical, automation
  6. Manufacturing & procurementIn-house equipment plus reputed OEMs
  7. Construction & erectionCivil works, installation, piping, electricals
  8. CommissioningBiological start-up, stabilisation and performance tests
  9. Ramp-up & O&MOne-year support, training and lifecycle service

Want to know what a plant will cost? Read our CBG plant cost guide, check the GOBARdhan subsidy, or send us your project details.

Frequently asked questions

Turnkey EPC (Engineering, Procurement and Construction) for a CBG plant covers process design, feedstock handling and pretreatment, digesters and agitators, gas storage, H₂S/moisture/CO₂ removal, compression and cascades, civil, mechanical and electrical works, PLC/SCADA automation, safety systems, digestate handling, installation, commissioning and performance testing under a single contract.

Biovardhan combines EPC with in-house manufacturing of agitators, biomass shearing machines and plant components. We add biomass pretreatment before the digester and digestate-to-FOM, biochar and pellet solutions after it, which we call Pre-CBG + CBG + Post-CBG. We are also an Authorized Channel Partner of AMOCO membrane gas holders for India.

3 TPD, 5 TPD, 6 TPD, 9 TPD, 10 TPD, 12 TPD, 15 TPD, 18 TPD, 20 TPD and above. See detailed guides for 5 TPD and 10 TPD plants. The right size depends on your feedstock availability within an economic radius and your offtake arrangement.

Yes. We coordinate DPR, GOBARdhan unified registration, OMC/offtake LOI, pollution control, PESO, fire and electrical permissions, bank documentation and applicable CFA/incentive claim documentation. Eligibility always depends on the guidelines in force when you apply.

Yes. We provide one-year operational ramp-up support, operator training, feedstock and supply-chain management support and post-installation O&M.

Build a CBG plant that performs, not just one that gets commissioned.

Talk to Biovardhan about feedstock, capacity (3 TPD to 20+ TPD), DPR, GOBARdhan registration and turnkey EPC.